PRODUCTS

Home > Products > Concrete Drain Pipe Making Machine > Manhole Mould > precast concrete manhole molds
·
1 / 8

precast concrete manhole molds

precast concrete manhole molds
precast concrete manhole molds
Contact Now
Contact Now

Product Description

Product Description

 Indispensable to inspection well chamber drainage pipeline construction, generally located in pipeline interchange, bend, pipe diameter, or slope change, at regular intervals and on the straight pipe sections, facilitate periodic inspection pipe, valves and other equipment of the access hole, and the export of clearing.

 A concrete culvert mould is a form or template used to shape and create concrete culverts. Culverts are underground tunnels or pipes that allow water to flow underneath roads, railways, or other structures. The concrete manhole mold is typically made of metal or plastic and is designed to create the specific shape and dimensions required for the culvert. The concrete is poured into the mould and allowed to set and harden, forming a durable and strong culvert that can withstand the weight of vehicles and the pressure of water flow. Using a Concrete Manhole Mould helps ensure that the culvert is made to the correct specifications and is structurally sound.

SPECIFICATIONS FOR Inspection Well Mould

Ф1000

Thickness

100

mm

Final inspection diameter

300,400,500,600

mm

Weight

10000

kg

Ф1200

Thickness

120

mm

Final inspection diameter

600,800

mm

Weight

14000

kg

Ф1500

Thickness

150

mm

Final inspection diameter

800,1000

mm

Weight

16000

kg

Main Features of  precast concrete inspection well  manhole

1.The installation is simple
2. Interface sealing
3. The subsidence and earthquake resistance
4. Pipeline engineering price low, running stable quality
5. Short construction time limit for a project
6. To save energy, the structure is reliable
7. Do not leak slurry

Production structure

1. The inspection shaft are made of reinforced concrete, increase the strength of inspection Wells, frost    resistance,     permeability resistance.
2. The circle respectively from the bottom of inspection Wells, well chamber, adjusting block, well of neck.
3. Respectively by the well chamber of rectangular inspection Wells, well the upper chamber, the well chamber at the lower of central, regulating block, shaft neck.

Final Product

YOU MIGHT ALSO LIKE

GET IN TOUCH

If you have any questions our products or services,feel free to reach out to us.Provide unique experiences for everyone involved with a brand. we’ve got preferential price and best-quality products for you.

Send Inquiry
*
*

We will contact you immediately

Fill in more information so that we can get in touch with you faster

Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.

Send